Friday, August 8, 2008

Preparing the Park





Time is growing short and there is still much to be done. :) These photos show the flurry of activity that has been going on at the site. The top photo shows both concrete specialists, Dan Whittle who is doing the pedestal, and Dan Allen who is doing the sidewalks; Utah Power placing a meter so that the park can have electricity, the engineers taking readings so that they can lay out the sidewalks.
Another photo shows the boyscouts digging the trench for the irrigation which will need to be laid to the planter in front of hte monument,
The third photo shows the layout of the site from the flagpole to the information booth

0 comments: